Where the grid still has room
All 55 of Cyprus's transmission substations, grouped by EAC area office and ranked by available RES capacity.
SNAPSHOT · 14/09/2026 · 04:20 · As published by DSD
34 of 55 substations have available capacity left to allocate.
The two columns do not say the same thing. Utilization compares installed RES against hosting capacity; available capacity is what is left to allocate. A substation can read 83% with zero MW available when something else binds the capacity, approved projects not yet connected, for instance.
55 of 55
Central & North-West Area
15 substations · 8 with room · 395.9 MW
South-West Area
14 substations · 10 with room · 344.8 MW
South-East Area
17 substations · 11 with room · 325.1 MW
- COMMERCIAL CENTRE65.3 MW8%
- PROTARAS56.1 MW17%
- INTERNATIONAL AIRPORT (GIS)44.8 MW48%
- AYIA NAPA39.8 MW8%
- MELIZONA35.7 MW22%
- LARNACA27.7 MW62%
- MARI17.8 MW60%
- VASILIKOS SOUTH16.7 MW59%
- DHEKELIA GIS 132kV10.1 MW79%
- SOTIRA6.2 MW87%
- PYLA-GIS 132kV4.9 MW89%
- ATHIENOU0.0 MW100%
- AY.NICOLAOS0.0 MW100%
- FREE INDUSTRIAL ZONE0.0 MW100%
- KOPHINOU0.0 MW100%
- PSEVDASDSMK0.0 MW—
- ALEXIGROSDSMK——
Paphos Area
9 substations · 5 with room · 164.0 MW
SNAPSHOT · 14/09/2026 · 04:20 · As published by DSD
Indicative assessment. It is not planning or investment advice. Confirm with the competent authorities.