STROUMBI

RES hosting capacity 17.74 MW
Available today 0.00 MW Saturated
Substation upgrade 2027 +24 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

17 of the 44 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 17 6.459 5.1 / 11
All 44 26.487 51.27 / 162.79

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 Α.ΚΕΡΑΣΙ (ΦΩΤΟΒΟΛΤΑΙΚΑ) ΛΤΔ 2.5 5.4 498005379
100 Α.ΚΕΡΑΣΙ (ΦΩΤΟΒΟΛΤΑΙΚΑ) ΛΤΔ 2.5 5.4 498005380
70 Private individual 0.147 0.1 0.2 498003240
35 Private individual 0.15 400484957
35 HUBLOC ENERGY LTD 1.3 498001009
35 HUBLOC ENERGY LTD 1.3 498001010
35 HUBLOC ENERGY LTD 2.5 498001014
35 KARROSIS LTD 0.119 498005724
35 KARROSIS LTD 0.119 498005725
35 KARROSIS LTD 0.119 498005726
35 KARROSIS LTD 0.119 498005727
35 KARROSIS LTD 0.119 498005728
35 KARROSIS LTD 0.119 498005729
35 KARROSIS LTD 0.063 498005730
35 ARKINA (ΑΝΑΝΕΩΣΙΜΕΣ ΠΗΓΕΣ ΕΝΕΡΓΕΙΑΣ) 0.119 498005731
35 ARKINA (ΑΝΑΝΕΩΣΙΜΕΣ ΠΗΓΕΣ ΕΝΕΡΓΕΙΑΣ) 0.119 498005732
35 ARKINA (ΑΝΑΝΕΩΣΙΜΕΣ ΠΗΓΕΣ ΕΝΕΡΓΕΙΑΣ) 0.047 498005733
The 27 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BIOLAND PROJECT 79 LTD 1.5 400488866
JPB ENERGY LTD 4 400489286
Private individual 0.15 498000213
Private individual 0.1 498000215
CANELIX ENERGY LTD 0.456 498000245
Private individual 0.15 498000246
Private individual 0.15 498000247
Private individual 0.15 498000248
MILIA ENERGY LTD 1.526 1 4 498000286
ELPAM ENERGY LTD 0.864 498000287
Private individual 0.15 498000313
Private individual 0.15 498000314
ARNAL VERDE LTD 3.232 1 4 498000353
Private individual 0.15 498000399
Private individual 0.1 498000400
KAO ENERGY LIMITED 0.653 498001053
QABAC ENERGY LIMITED 0.477 498001054
T.S.V ENERGY OF FUTURE LTD 1 498001435
BIOLAND PROJECT 58 LTD 0.12 0.12 0.12 498001879
BIOLAND PROJEKT 58 LTD 0.12 0.12 0.12 498001880
RENEWABLE SOLARVIKING LTD 0.1 498003478
Private individual 0.8 498004103
BIOLAND BESS LTD 40 128 498004465
BP-S 133 LTD 0.15 0.15 0.45 498004707
WATTZ PROJECT 1 LTD 1.13 1.13 4.5 498005229
WATTZ PROJECT 2 LTD 0.15 0.15 0.6 498005230
ΑΗΚ- ΒΡΔ ΠΑΡΑΓΩΓΗΣ 2.5 2.5 10 498005614

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.