STROUMBI
RES hosting capacity 17.74 MW
Available today 0.00 MW Saturated
Substation upgrade 2027 +24 MW (N-1) ΔΠΑΣΜ draft, under consultation
DSO priority list
17 of the 44 applications meet the maturity criteria and are in the priority line.
Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026
| Applications | RES MW | Batteries MW / MWh | |
|---|---|---|---|
| In line | 17 | 6.459 | 5.1 / 11 |
| All | 44 | 26.487 | 51.27 / 162.79 |
In the priority line
| Score | Applicant | RES MW | Battery MW | Battery MWh | Application |
|---|---|---|---|---|---|
| 100 | Α.ΚΕΡΑΣΙ (ΦΩΤΟΒΟΛΤΑΙΚΑ) ΛΤΔ | 2.5 | 5.4 | 498005379 | |
| 100 | Α.ΚΕΡΑΣΙ (ΦΩΤΟΒΟΛΤΑΙΚΑ) ΛΤΔ | 2.5 | 5.4 | 498005380 | |
| 70 | Private individual | 0.147 | 0.1 | 0.2 | 498003240 |
| 35 | Private individual | 0.15 | 400484957 | ||
| 35 | HUBLOC ENERGY LTD | 1.3 | 498001009 | ||
| 35 | HUBLOC ENERGY LTD | 1.3 | 498001010 | ||
| 35 | HUBLOC ENERGY LTD | 2.5 | 498001014 | ||
| 35 | KARROSIS LTD | 0.119 | 498005724 | ||
| 35 | KARROSIS LTD | 0.119 | 498005725 | ||
| 35 | KARROSIS LTD | 0.119 | 498005726 | ||
| 35 | KARROSIS LTD | 0.119 | 498005727 | ||
| 35 | KARROSIS LTD | 0.119 | 498005728 | ||
| 35 | KARROSIS LTD | 0.119 | 498005729 | ||
| 35 | KARROSIS LTD | 0.063 | 498005730 | ||
| 35 | ARKINA (ΑΝΑΝΕΩΣΙΜΕΣ ΠΗΓΕΣ ΕΝΕΡΓΕΙΑΣ) | 0.119 | 498005731 | ||
| 35 | ARKINA (ΑΝΑΝΕΩΣΙΜΕΣ ΠΗΓΕΣ ΕΝΕΡΓΕΙΑΣ) | 0.119 | 498005732 | ||
| 35 | ARKINA (ΑΝΑΝΕΩΣΙΜΕΣ ΠΗΓΕΣ ΕΝΕΡΓΕΙΑΣ) | 0.047 | 498005733 |
The 27 applications outside the line
| Applicant | RES MW | Battery MW | Battery MWh | Application |
|---|---|---|---|---|
| BIOLAND PROJECT 79 LTD | 1.5 | 400488866 | ||
| JPB ENERGY LTD | 4 | 400489286 | ||
| Private individual | 0.15 | 498000213 | ||
| Private individual | 0.1 | 498000215 | ||
| CANELIX ENERGY LTD | 0.456 | 498000245 | ||
| Private individual | 0.15 | 498000246 | ||
| Private individual | 0.15 | 498000247 | ||
| Private individual | 0.15 | 498000248 | ||
| MILIA ENERGY LTD | 1.526 | 1 | 4 | 498000286 |
| ELPAM ENERGY LTD | 0.864 | 498000287 | ||
| Private individual | 0.15 | 498000313 | ||
| Private individual | 0.15 | 498000314 | ||
| ARNAL VERDE LTD | 3.232 | 1 | 4 | 498000353 |
| Private individual | 0.15 | 498000399 | ||
| Private individual | 0.1 | 498000400 | ||
| KAO ENERGY LIMITED | 0.653 | 498001053 | ||
| QABAC ENERGY LIMITED | 0.477 | 498001054 | ||
| T.S.V ENERGY OF FUTURE LTD | 1 | 498001435 | ||
| BIOLAND PROJECT 58 LTD | 0.12 | 0.12 | 0.12 | 498001879 |
| BIOLAND PROJEKT 58 LTD | 0.12 | 0.12 | 0.12 | 498001880 |
| RENEWABLE SOLARVIKING LTD | 0.1 | 498003478 | ||
| Private individual | 0.8 | 498004103 | ||
| BIOLAND BESS LTD | 40 | 128 | 498004465 | |
| BP-S 133 LTD | 0.15 | 0.15 | 0.45 | 498004707 |
| WATTZ PROJECT 1 LTD | 1.13 | 1.13 | 4.5 | 498005229 |
| WATTZ PROJECT 2 LTD | 0.15 | 0.15 | 0.6 | 498005230 |
| ΑΗΚ- ΒΡΔ ΠΑΡΑΓΩΓΗΣ | 2.5 | 2.5 | 10 | 498005614 |
The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».
DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026