Screen your parcel for solar. Grid capacity, planning constraints. No paperwork, no waiting, free.
See what the grid can take, before you commit to land.
EXAMPLE
What the map answers about a parcel.
- Plot area 22,161 m²
- Town planning zone Γα4 · Agricultural / peri-urban zones
- Terrain slope 33% over 25% · Mean 20%
- Parcel access Access from a registered dirt road is indicated
- Exclusion zones No exclusion zone found.
- Conditional zones Buffer zone 1000-1500 m from the Natura 2000 network
- Available capacity ALAMBRA · 0.0 MW · Saturated
Each line shows what its source publishes. It is not an approval and it does not add up to a verdict. Parcels are approved by the responsible authorities, not by us.
Today 19 of 55 substations are full; 1,229.8 MW is left across the other 34.
EAC / DSD · 14/09/2026
Six sources, one map.
- EAC / DSD
- Hosting capacity and area of influence per substation, with daily history.
- DSMK
- The ten-year transmission development plan: which substations are being upgraded, and when.
- TPO
- Exclusion and conditional zones for PV, per ΕΝΤΟΛΗ 1/2024.
- DLS
- Parcel boundaries and planning zones, with their building coefficients, CC BY 4.0.
- RAEK
- Licences, exemptions and applications: what already exists nearby.
- OpenStreetMap
- The map's basemap, © OpenStreetMap contributors, ODbL 1.0.
WHO WE ARE
The team licensing RES projects in Cyprus
Behind every parcel check stand four specialists.
-
Energy engineer
Grid and substations
-
Architect
Planning and permits
-
Environmental engineer
Exclusion zones and Natura
-
Land surveyor
Cadastre and boundaries