PISSOURI

RES hosting capacity 20.00 MW
Available today 0.00 MW Saturated
Substation upgrade 2028 +64 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

4 of the 56 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 4 11.2 4 / 18
All 56 207.539 108.005 / 303.75

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
70 L & T SUN ENERGY LTD 1 4 18 498002216
35 ASP 304 SOLAR LTD 2.1 400493666
35 GIANKO 1 SOLAR LTD 7.95 400493672
35 Private individual 0.15 498003740
The 52 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
CYPV ENERGY LTD 5 400386041
AGM LIGHTPOWER LTD 5 400386422
AGM LIGHTPOWER LTD 5 400386423
SUNECO INDUSTRIES LTD 2 400410881
Private individual 6 400411446
SOLEK CYPRUS SERVICES LTD 1.66 400458771
BIOLAND PROJECT 83 LTD 1.1 400481056
BIOLAND PROJECT 73 LTD 1.5 400481063
L.E. EVERGREEN ENERGY LTD 8 5 10 400484448
L.E. EVERGREEN ENERGY LTD 8 5 10 400484450
L.E. EVERGREEN ENERGY LTD 2.3 1.5 3 400484451
L.E. EVERGREEN ENERGY LTD 3.7 2 4 400484452
L.E. EVERGREEN ENERGY LTD 4 2.5 5 400484453
ARNAL VERDE LTD 7.99 1 4 498000209
Y.A. PV ENERGY LTD 2.2 498001131
KERIA ENERGY LIMITED 4.5 4.05 1.35 498001427
GOTIARE LIMITED 1.04 0.6 1.5 498001450
GOTIARE LIMITED 6.558 3.4 8.5 498001451
GOTIARE LIMITED 4.158 2.2 5.5 498001452
GOTIARE LIMITED 3.122 1.7 4 498001453
GOTIARE LIMITED 1.554 0.8 2 498001454
GOTIARE LIMITED 3.731 2 5 498001455
GOTIARE LIMITED 2.779 1.5 4 498001456
GOTIARE LIMITED 1.12 0.6 1.5 498001457
ZECORANO ENERGY LTD 2.117 1.4 2.8 498001790
SUNFAN LIMITED 5.055 498001894
AGM LIGHTPOWER LTD 5 498001895
GOTIARE LIMITED 5.76 4 8 498002051
GOTIARE LIMITED 7.04 4.75 9.5 498002052
GOTIARE LIMITED 6.58 4.45 8.9 498002053
GOTIARE LIMITED 7.96 5.55 11.1 498002054
GOTIARE LIMITED 6.7 4.5 9 498002056
ERGO ENERGY PV PARKS LTD 5 2 4 498002059
VALYRIAN INVESTMENT LTD 0.15 498002150
AGM LIGHTPOWER LTD 5 498002214
SOLEK LEMESOS I LTD 7.43 498002235
ESPERIA GREEN ENERGY LTD 8 5.1 10.2 498002247
DAROSTEL LTD 2.5 498002287
BIOLAND PROJECT 40 LTD 1.2 1.2 2.4 498002526
ERGO ENERGY PV PARKS LTD 8 2.5 5 498003005
Private individual 1.08 498003162
DAISYRISE VENTURES LTD 4.5 2 8.4 498003527
BP-S 158 LTD 0.7 0.7 2.1 498005045
SUNFAN LIMITED 5.055 5.055 22.5 498005125
CLASSONE SOLAR GARDEN LTD 3 12 498005323
CLASSONE SOLAR BREEZE LTD 1.5 6 498005324
BP-S 157 LTD 2.1 2.1 6.3 498005332
BP-S 157 LTD 1.4 1.4 4.2 498005333
ASP 304 SOLAR LTD 5 10 498005599
SELECT CAR RENTALS LTD 498005615
GIANKO 1 SOLAR LTD 7.95 32 498005736
Private individual 6 6 42 498005762

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.