ATHIENOU

RES hosting capacity 26.00 MW
Available today 0.00 MW Saturated
Substation upgrade 2031 +64 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

3 of the 53 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 3 0 4.2 / 16.8
All 53 139.833 71.715 / 180.665

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 BIOLAND PROJECT 27 LTD 2.5 10 498004752
100 BIOLAND PROJECT 27 LTD 0.5 2 498004757
100 BIOLAND PROJECT 18 LTD 1.2 4.8 498005265
The 50 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BIOLAND PROJECT 57 LTD 1.2 400478234
BIOLAND PROJECT 77 LTD 1.5 400478306
BIOLAND PROJECT 88 LTD 3.5 400485917
BIOLAND PROJECT 68 LTD 1 400485946
BIOLAND PROJECT 38 LTD 0.1 498000342
BP-S 109 2.4 498001414
GKA SUNENERGY LTD 2.983 0.995 2.973 498001415
GKA SUNENERGY LTD 1.243 0.414 1.155 498001416
GKA SUNENERGY LTD 3.605 1.202 3.59 498001417
GKA SUNENERGY LTD 0.45 0.15 3.59 498001419
BP-S 109 LTD 4 498001629
BP-S 113 LTD 0.9 0.9 0.9 498001751
ERGO ENERGY PV PARKS LTD 1.5 498001903
FUTURE SUN POWER LTD 6.961 3 3 498002001
GKA SUNENERGY LTD 0.4 0.13 0.54 498002063
GKA SUNENERGY LTD 0.62 0.21 0.82 498002064
ELECTRILO LTD 1.5 498002257
GKA SUNPOWER LTD 8 2.67 14.68 498002560
GKA SUNPOWER LTD 0.72 0.24 1.39 498002561
GKA SUNPOWER LTD 1.4 0.47 2.6 498002562
GKA SUNPOWER LTD 0.69 1.28 0.23 498002566
GKA SUNPOWER LTD 2.081 4.034 0.697 498002567
GKA SUNPOWER LTD 2.68 0.9 5.2 498002593
GKA SUNPOWER LTD 4.64 1.55 8.6 498002744
BP_S 113 LTD 2.3 2.3 4.6 498002777
BP_S 113 LTD 3.5 3.5 7 498002780
BP_S 136 LTD 0.5 0.5 1 498002784
BP_S 136 LTD 1.2 1.2 2.4 498002785
BP_S 121 LTD 3 3 6 498002786
IVSMM ENERGY LTD 4.6 0.85 1.7 498002819
HELIOPEX 4 LTD 1.43 0.5 1 498002860
GALBENTA LTD 6.05 6 15 498002927
HELIOPEX 5 LTD 8 8 14 498003103
HELIOPEX 5 LTD 2.8 2.8 5 498003473
PLETEA INVESTMENTS LTD 6.11 3 5 498003659
D.P.ELSIM LTD 4 498003686
D.P.ELSIM LTD 5 498003687
D.P.ELSIM LTD 7 498003688
IGVA SOLAR ENERGY LTD 3.9 2.5 10 498004031
IGVA SOLAR ENERGY LTD 1.97 1.97 2 498004450
MANDRILL LTD 8 5 10 498004675
BIOLAND PROJECT 57 LTD 1.5 1.5 6 498004685
Private individual 0.15 498004852
ELOADS ENERGIES STORAGE LTD 1.95 1.95 5 498004981
ELOADS ENERGIES STORAGE LTD 8 498004984
BP-S 109 LTD 1 1 3 498005613
BP-S 160 LTD 0.3 0.3 1.2 498005648
BP-S 160 LTD 0.6 0.6 2.4 498005649
BP-S 160 LTD 2.4 2.4 9.6 498005650
BP-S 136 LTD 0.5 0.5 2 498005742

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.