AYIOS ATHANASIOS

RES hosting capacity 49.79 MW
Available today 28.83 MW
Substation upgrade 2035 +40 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

The one application does not meet the maturity criteria yet, so it is not in the line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 0 0 0 / 0
All 1 0.63 0.63 / 2.52
The 1 application outside the line
Applicant RES MW Battery MW Battery MWh Application
DOMOPLEX LTD 0.63 0.63 2.52 498005630

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.

Want a professional check on a parcel served by this substation?

Parcel check →