RES hosting capacity 50.54 MW
Available today 0.00 MW Saturated
Substation upgrade 2031 +40 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

2 of the 16 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 2 0 3.25 / 11
All 16 51.48 44.05 / 160.68

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 SOLUTRONIC ENERGY (CY) LTD 0.25 1 498005616
100 TEKOS RENEWABLE TECHNOLOGIES LTD 3 10 498005792
The 14 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
REVESIUS LTD 0.3 498001758
REVESIUS LTD 4.5 498001759
Private individual 1.03 498001882
GOTIARE LIMITED 5.28 3.4 6.8 498002058
MEZIA LTD 5.32 498002386
CH.FOULLI ENERGY&CONSULTING LTD 0.15 498002548
SOLAR FLOW ENERGY LTD 6.5 4.5 18 498002821
SOLAR FLOW ENERGY LTD 2.7 2 8 498002822
ΑΡΗΣ ΑΘΛΗΤΙΚΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΛΤΔ 7.96 7.8 16.26 498003697
ΑΡΗΣ ΑΘΛΗΤΙΚΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΛΤΔ 2.59 2.4 5.42 498003698
ΑΡΗΣ ΑΘΛΗΤΙΚΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΛΤΔ 2.15 2 4.4 498003699
DAISYRISE VENTURES LTD 7 5 20 498004339
REVESIUS LTD 6 6 40 498004609
ΜΥ SUN PARK (MONAGROULLI) LTD 7.7 30.8 498005636

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026