Skip to content

SEMINARY

RES hosting capacity 78.10 MW
Available today 47.85 MW
Substation upgrade No year published

DSO priority list

All 3 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 3 0.354 0 / 0
All 3 0.354 0 / 0

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
65 ALTURA POWER LTD 0.119 498005568
65 ALTURA POWER LTD 0.117 498005569
65 ALTURA POWER LTD 0.118 498005570

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map