ATHALASSA 132kV
RES hosting capacity 40.24 MW
Available today 0.00 MW Saturated
Substation upgrade 2027 +48.5 MW (N-1) ΔΠΑΣΜ draft, under consultation
DSO priority list
2 of the 6 applications meet the maturity criteria and are in the priority line.
Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026
| Applications | RES MW | Batteries MW / MWh | |
|---|---|---|---|
| In line | 2 | 3.5 | 1 / 12 |
| All | 6 | 16.923 | 10.36 / 41.76 |
In the priority line
| Score | Applicant | RES MW | Battery MW | Battery MWh | Application |
|---|---|---|---|---|---|
| 70 | AGM SUNFIELD LTD | 0.5 | 1 | 12 | 498005668 |
| 35 | Y & K SOLAR ENERGY LTD | 3 | 498001786 |
The 4 applications outside the line
| Applicant | RES MW | Battery MW | Battery MWh | Application |
|---|---|---|---|---|
| S.S.H SOLAR ENERGY PLUS LTD | 3.063 | 498002088 | ||
| D.P. ELSΙM LTD | 1 | 498002801 | ||
| WINVESTPOLIS ENERGY LTD | 2 | 2 | 4 | 498005559 |
| ESPERIA ENERGY (AGLANTZIA 1) LTD | 7.36 | 7.36 | 25.76 | 498005560 |
The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».
DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026