ATHALASSA 132kV

RES hosting capacity 40.24 MW
Available today 0.00 MW Saturated
Substation upgrade 2027 +48.5 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

2 of the 6 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 2 3.5 1 / 12
All 6 16.923 10.36 / 41.76

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
70 AGM SUNFIELD LTD 0.5 1 12 498005668
35 Y & K SOLAR ENERGY LTD 3 498001786
The 4 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
S.S.H SOLAR ENERGY PLUS LTD 3.063 498002088
D.P. ELSΙM LTD 1 498002801
WINVESTPOLIS ENERGY LTD 2 2 4 498005559
ESPERIA ENERGY (AGLANTZIA 1) LTD 7.36 7.36 25.76 498005560

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.