TRANSMISSION SUBSTATION

AY.NICOLAOS

AY.NICOLAOS transmission substation (EAC): 0.00 MW of available RES capacity out of 40.44 MW hosting capacity, 100.0% utilized. As published by DSD, snapshot of 14 Sept 2026.

EAC-owned T03SS005 As published by DSD · snapshot 14/09/2026, 04:20

Capacity

Utilization
RES hosting capacity40.44 MW
Installed RES40.44 MW
Available capacity0.00 MW
Utilization100.0%
Nominal rating63 MVA
Firm capacity32 MVA
OwnershipEAC-owned
Coordinates35.0489°N · 33.8814°E

Saturated. This substation publishes zero available capacity.

Capacity history

From our own daily snapshots of the source.

Available capacity (MW)Utilization (%)
View the data as a table
Capacity history
DateAvailable capacityUtilization
17 Jul 20260.00 MW100.0%
18 Jul 20260.00 MW100.0%
19 Jul 20260.00 MW100.0%
20 Jul 20260.00 MW100.0%
21 Jul 20260.00 MW100.0%
22 Jul 20260.00 MW100.0%
23 Jul 20260.00 MW100.0%
24 Jul 20260.00 MW100.0%
25 Jul 20260.00 MW100.0%
26 Jul 20260.00 MW100.0%
27 Jul 20260.00 MW100.0%
28 Jul 20260.00 MW100.0%
29 Jul 20260.00 MW100.0%
30 Jul 20260.00 MW100.0%
31 Jul 20260.00 MW100.0%
1 Aug 20260.00 MW100.0%
2 Aug 20260.00 MW100.0%
3 Aug 20260.00 MW100.0%
4 Aug 20260.00 MW100.0%
5 Aug 20260.00 MW100.0%
6 Aug 20260.00 MW100.0%
7 Aug 20260.00 MW100.0%
8 Aug 20260.00 MW100.0%
9 Aug 20260.00 MW100.0%
10 Aug 20260.00 MW100.0%
11 Aug 20260.00 MW100.0%
12 Aug 20260.00 MW100.0%
13 Aug 20260.00 MW100.0%
14 Aug 20260.00 MW100.0%
15 Aug 20260.00 MW100.0%
16 Aug 20260.00 MW100.0%
17 Aug 20260.00 MW100.0%
18 Aug 20260.00 MW100.0%
19 Aug 20260.00 MW100.0%
20 Aug 20260.00 MW100.0%
21 Aug 20260.00 MW100.0%
22 Aug 20260.00 MW100.0%
23 Aug 20260.00 MW100.0%
24 Aug 20260.00 MW100.0%
25 Aug 20260.00 MW100.0%
26 Aug 20260.00 MW100.0%
27 Aug 20260.00 MW100.0%
28 Aug 20260.00 MW100.0%
29 Aug 20260.00 MW100.0%
30 Aug 20260.00 MW100.0%
31 Aug 20260.00 MW100.0%
1 Sept 20260.00 MW100.0%
2 Sept 20260.00 MW100.0%
3 Sept 20260.00 MW100.0%
4 Sept 20260.00 MW100.0%
5 Sept 20260.00 MW100.0%
6 Sept 20260.00 MW100.0%
7 Sept 20260.00 MW100.0%
8 Sept 20260.00 MW100.0%
9 Sept 20260.00 MW100.0%
10 Sept 20260.00 MW100.0%
11 Sept 20260.00 MW100.0%
12 Sept 20260.00 MW100.0%
13 Sept 20260.00 MW100.0%
14 Sept 20260.00 MW100.0%

DSO area of influence

The DSO publishes an area of influence for this substation; it is not a connection guarantee.

A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.

PV applications conditional on an upgrade

Applications for a ΠΟΣ connection offer for PV outside the Support Scheme, under examination conditional on upgrading the transmission substation. This is not the total pending pipeline.

Applications73
Capacity applied for241.13 MW

Demand against available capacity

73 applications are asking for 241.13 MW. The DSO publishes zero available capacity for this substation.

The two figures come from different publications: the queued demand from Appendix ΣΤ and the available capacity as published by the DSO, captured on different dates. This is not an estimate of any application’s outcome, and it is not a priority order.

DPASD 2025-2034, Appendix ΣΤ

Not yet integrated

The following exist in published sources but are not yet integrated into Το Δίκτυο. While they are missing, we do not put an estimate in their place.

  • Upgrade request

    PENDING

    DSD requests as recorded in DPASM 2026-2035.

  • Loading projections

    PENDING

    DPASM 2026-2035, Appendix 4.

  • Projects inside the DSO area of influence

    PENDING

    Anonymized project dots inside the DSO-published area of influence.

Frequently asked questions

How much RES capacity is available at AY.NICOLAOS substation?
None. AY.NICOLAOS substation publishes 0.00 MW of available RES capacity, which means it is saturated against 40.44 MW of hosting capacity.
Is AY.NICOLAOS substation saturated?
Yes. AY.NICOLAOS substation publishes zero available RES capacity. New capacity depends on a network upgrade.
Who owns AY.NICOLAOS substation?
AY.NICOLAOS substation is owned by EAC. It is one of the 52 EAC-owned transmission substations, out of 55 in total.
Is a DSO area of influence published for AY.NICOLAOS substation?
Yes. A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.
How recent is this data?
Snapshot of 14 Sept 2026. We reproduce what DSD publishes. These are not realtime measurements.

Sources

Electricity Authority of Cyprus, Distribution System Operator · DSD ArcGIS service, RES hosting per transmission substation.

We reproduce what DSD publishes. These are not realtime measurements.

Indicative assessment. It is not planning or investment advice. Confirm with the competent authorities.

Το Δίκτυο shows the state of the grid; it does not promise approvals.