LARNACA

RES hosting capacity 73.78 MW
Available today 21.23 MW
Substation upgrade 2028 +17 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

10 of the 19 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 10 4.665 2 / 4.928
All 19 23.985 33.319 / 82.624

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 BIOLAND PROJECT 45 LTD 0.9 3.6 498005578
100 DRACOUDIS ENERGY LTD 0.1 0.128 498005700
35 G.IOANNOU EMPORIKI LTD 0.342 498003120
35 G.IOANNOU EMPORIKI LTD 0.118 498003150
35 Private individual 0.055 498004274
35 LARNACA SOLAR ROOFS (LASR) LTD 2.2 1 1.2 498004822
35 CED ELECTRIC DISTRIBUTORS LTD 0.2 498005008
35 CED ELECTRIC DISTRIBUTORS LTD 0.25 498005010
35 CED ELECTRIC DISTRIBUTORS LTD 0.2 498005011
35 S. MARSELLI BEYOND ENERGY LTD 1.3 498005604
The 9 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BIOLAND PROJECT 46 LTD 4.5 4.5 4.5 498001870
BIOLAND PROJECT 46 LTD 7 7 7 498001871
BIOLAND PROJECT 46 LTD 2 2 2 498001872
IGVA SOLAR ENERGY LTD 2 2 2 498003829
PETROLINA ELECTRIC LTD 2.02 2.02 5 498004906
BIOLAND PROJECT 60 LTD 0.999 3.996 498005266
BIOLAND PROJECT 22 LTD 0.8 3.2 498005272
ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 1.8 498005625
PETROLINA ENERGY LTD 12 50 498005638

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.