RES hosting capacity 44.24 MW
Available today 13.95 MW
Substation upgrade 2027 ΔΠΑΣΜ draft, under consultation

DSO priority list

7 of the 16 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 7 4.788 6 / 17
All 16 21.191 15.38 / 33.04

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 ΤΣΙΜΕΝΤΟΠΟΙΕΙΑ ΒΑΣΙΛΙΚΟΥ ΔΗΜΟΣΙΑ ΕΤΑΙΡΕΙΑ ΛΤΔ 4 16 498005487
70 THE CYPRUS CEMENT PUBLIC CO LTD 2.795 2 1 498000231
35 Private individual 0.85 498000183
35 Α.Μ. ΠΤΗΝΟΤΡΟΦΕΙΑ ΛΤΔ 0.2 498002434
35 MGE MARONI GREEN ENERGY LTD 0.675 498002734
35 Petrolina Electric ltd 0.218 498003788
35 THEOGENTRIC LTD 0.05 498004684
The 9 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BIOLAND PROJECT 58 LTD 1.5 400413351/400394493
BIOLAND PROJECT 86 LTD 1.25 400478286
ARNAL VERDE LTD 1.254 498000140
ARNAL VERDE LTD 2.799 1 4 498000143
BP-S 126 LTD 2.3 2.3 2.3 498001964
ELECTRILO LTD 5.5 4 1.6 498002256
BIOLAND PROJECT 89 LTD 0.4 0.4 0.8 498002790
IGVA SOLAR ENERGY LTD 1.4 1 4 498005320
MGE MARONI GREEN ENERGY LTD 0.68 3.34 498005735

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.