MARI transmission substation (EAC): 17.81 MW of available RES capacity out of 44.24 MW hosting capacity, 59.7% utilized. As published by DSD, snapshot of 14 Sept 2026.

EAC-owned T03SS021 As published by DSD · snapshot 14/09/2026, 04:20

Capacity

Utilization
RES hosting capacity44.24 MW
Installed RES26.43 MW
Available capacity17.81 MW
Utilization59.7%
Nominal rating40 MVA
Firm capacity40 MVA
OwnershipEAC-owned
Coordinates34.7274°N · 33.3148°E

Capacity history

From our own daily snapshots of the source.

Available capacity (MW)Utilization (%)
View the data as a table
Capacity history
DateAvailable capacityUtilization
17 Jul 202617.81 MW59.7%
18 Jul 202617.81 MW59.7%
19 Jul 202617.81 MW59.7%
20 Jul 202617.81 MW59.7%
21 Jul 202617.81 MW59.7%
22 Jul 202617.81 MW59.7%
23 Jul 202617.81 MW59.7%
24 Jul 202617.81 MW59.7%
25 Jul 202617.81 MW59.7%
26 Jul 202617.81 MW59.7%
27 Jul 202617.81 MW59.7%
28 Jul 202617.81 MW59.7%
29 Jul 202617.81 MW59.7%
30 Jul 202617.81 MW59.7%
31 Jul 202617.81 MW59.7%
1 Aug 202617.81 MW59.7%
2 Aug 202617.81 MW59.7%
3 Aug 202617.81 MW59.7%
4 Aug 202617.81 MW59.7%
5 Aug 202617.81 MW59.7%
6 Aug 202617.81 MW59.7%
7 Aug 202617.81 MW59.7%
8 Aug 202617.81 MW59.7%
9 Aug 202617.81 MW59.7%
10 Aug 202617.81 MW59.7%
11 Aug 202617.81 MW59.7%
12 Aug 202617.81 MW59.7%
13 Aug 202617.81 MW59.7%
14 Aug 202617.81 MW59.7%
15 Aug 202617.81 MW59.7%
16 Aug 202617.81 MW59.7%
17 Aug 202617.81 MW59.7%
18 Aug 202617.81 MW59.7%
19 Aug 202617.81 MW59.7%
20 Aug 202617.81 MW59.7%
21 Aug 202617.81 MW59.7%
22 Aug 202617.81 MW59.7%
23 Aug 202617.81 MW59.7%
24 Aug 202617.81 MW59.7%
25 Aug 202617.81 MW59.7%
26 Aug 202617.81 MW59.7%
27 Aug 202617.81 MW59.7%
28 Aug 202617.81 MW59.7%
29 Aug 202617.81 MW59.7%
30 Aug 202617.81 MW59.7%
31 Aug 202617.81 MW59.7%
1 Sept 202617.81 MW59.7%
2 Sept 202617.81 MW59.7%
3 Sept 202617.81 MW59.7%
4 Sept 202617.81 MW59.7%
5 Sept 202617.81 MW59.7%
6 Sept 202617.81 MW59.7%
7 Sept 202617.81 MW59.7%
8 Sept 202617.81 MW59.7%
9 Sept 202617.81 MW59.7%
10 Sept 202617.81 MW59.7%
11 Sept 202617.81 MW59.7%
12 Sept 202617.81 MW59.7%
13 Sept 202617.81 MW59.7%
14 Sept 202617.81 MW59.7%

DSO area of influence

The DSO publishes an area of influence for this substation; it is not a connection guarantee.

A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.

PV applications conditional on an upgrade

Applications for a ΠΟΣ connection offer for PV outside the Support Scheme, under examination conditional on upgrading the transmission substation. This is not the total pending pipeline.

Applications11
Capacity applied for18.02 MW

Demand against available capacity

1.0× the published available capacity

11 applications are asking for 18.02 MW against 17.81 MW of available capacity.

The two figures come from different publications: the queued demand from Appendix ΣΤ and the available capacity as published by the DSO, captured on different dates. This is not an estimate of any application’s outcome, and it is not a priority order.

DPASD 2025-2034, Appendix ΣΤ

Not yet integrated

The following exist in published sources but are not yet integrated into Το Δίκτυο. While they are missing, we do not put an estimate in their place.

  • Upgrade request

    PENDING

    DSD requests as recorded in DPASM 2026-2035.

  • Loading projections

    PENDING

    DPASM 2026-2035, Appendix 4.

  • Projects inside the DSO area of influence

    PENDING

    Anonymized project dots inside the DSO-published area of influence.

Frequently asked questions

How much RES capacity is available at MARI substation?
MARI substation has 17.81 MW of available RES capacity out of 44.24 MW of hosting capacity, that is 59.7% utilization.
Is MARI substation saturated?
No. 17.81 MW of available RES capacity remain and utilization is 59.7%, as published by DSD.
Who owns MARI substation?
MARI substation is owned by EAC. It is one of the 52 EAC-owned transmission substations, out of 55 in total.
Is a DSO area of influence published for MARI substation?
Yes. A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.
How recent is this data?
Snapshot of 14 Sept 2026. We reproduce what DSD publishes. These are not realtime measurements.

Sources

Electricity Authority of Cyprus, Distribution System Operator · DSD ArcGIS service, RES hosting per transmission substation.

We reproduce what DSD publishes. These are not realtime measurements.

Indicative assessment. It is not planning or investment advice. Confirm with the competent authorities.

Το Δίκτυο shows the state of the grid; it does not promise approvals.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map