TRANSMISSION SUBSTATION

PAPACOSTAS

PAPACOSTAS transmission substation (EAC): 55.38 MW of available RES capacity out of 69.28 MW hosting capacity, 20.1% utilized. As published by DSD, snapshot of 14 Sept 2026.

EAC-owned T02SS041 As published by DSD · snapshot 14/09/2026, 04:20

Capacity

Utilization
RES hosting capacity69.28 MW
Installed RES13.90 MW
Available capacity55.38 MW
Utilization20.1%
Nominal rating95 MVA
Firm capacity63 MVA
OwnershipEAC-owned
Coordinates35.1733°N · 33.3979°E

Capacity history

From our own daily snapshots of the source.

Available capacity (MW)Utilization (%)
View the data as a table
Capacity history
DateAvailable capacityUtilization
17 Jul 202655.38 MW20.1%
18 Jul 202655.38 MW20.1%
19 Jul 202655.38 MW20.1%
20 Jul 202655.38 MW20.1%
21 Jul 202655.38 MW20.1%
22 Jul 202655.38 MW20.1%
23 Jul 202655.38 MW20.1%
24 Jul 202655.38 MW20.1%
25 Jul 202655.38 MW20.1%
26 Jul 202655.38 MW20.1%
27 Jul 202655.38 MW20.1%
28 Jul 202655.38 MW20.1%
29 Jul 202655.38 MW20.1%
30 Jul 202655.38 MW20.1%
31 Jul 202655.38 MW20.1%
1 Aug 202655.38 MW20.1%
2 Aug 202655.38 MW20.1%
3 Aug 202655.38 MW20.1%
4 Aug 202655.38 MW20.1%
5 Aug 202655.38 MW20.1%
6 Aug 202655.38 MW20.1%
7 Aug 202655.38 MW20.1%
8 Aug 202655.38 MW20.1%
9 Aug 202655.38 MW20.1%
10 Aug 202655.38 MW20.1%
11 Aug 202655.38 MW20.1%
12 Aug 202655.38 MW20.1%
13 Aug 202655.38 MW20.1%
14 Aug 202655.38 MW20.1%
15 Aug 202655.38 MW20.1%
16 Aug 202655.38 MW20.1%
17 Aug 202655.38 MW20.1%
18 Aug 202655.38 MW20.1%
19 Aug 202655.38 MW20.1%
20 Aug 202655.38 MW20.1%
21 Aug 202655.38 MW20.1%
22 Aug 202655.38 MW20.1%
23 Aug 202655.38 MW20.1%
24 Aug 202655.38 MW20.1%
25 Aug 202655.38 MW20.1%
26 Aug 202655.38 MW20.1%
27 Aug 202655.38 MW20.1%
28 Aug 202655.38 MW20.1%
29 Aug 202655.38 MW20.1%
30 Aug 202655.38 MW20.1%
31 Aug 202655.38 MW20.1%
1 Sept 202655.38 MW20.1%
2 Sept 202655.38 MW20.1%
3 Sept 202655.38 MW20.1%
4 Sept 202655.38 MW20.1%
5 Sept 202655.38 MW20.1%
6 Sept 202655.38 MW20.1%
7 Sept 202655.38 MW20.1%
8 Sept 202655.38 MW20.1%
9 Sept 202655.38 MW20.1%
10 Sept 202655.38 MW20.1%
11 Sept 202655.38 MW20.1%
12 Sept 202655.38 MW20.1%
13 Sept 202655.38 MW20.1%
14 Sept 202655.38 MW20.1%

DSO area of influence

The DSO publishes an area of influence for this substation; it is not a connection guarantee.

A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.

PV applications conditional on an upgrade

Applications for a ΠΟΣ connection offer for PV outside the Support Scheme, under examination conditional on upgrading the transmission substation. This is not the total pending pipeline.

This substation is not listed in Appendix ΣΤ. That means no applications are recorded as depending on upgrading it, not that there are no pending applications.

DPASD 2025-2034, Appendix ΣΤ

Not yet integrated

The following exist in published sources but are not yet integrated into Το Δίκτυο. While they are missing, we do not put an estimate in their place.

  • Upgrade request

    PENDING

    DSD requests as recorded in DPASM 2026-2035.

  • Loading projections

    PENDING

    DPASM 2026-2035, Appendix 4.

  • Projects inside the DSO area of influence

    PENDING

    Anonymized project dots inside the DSO-published area of influence.

Frequently asked questions

How much RES capacity is available at PAPACOSTAS substation?
PAPACOSTAS substation has 55.38 MW of available RES capacity out of 69.28 MW of hosting capacity, that is 20.1% utilization.
Is PAPACOSTAS substation saturated?
No. 55.38 MW of available RES capacity remain and utilization is 20.1%, as published by DSD.
Who owns PAPACOSTAS substation?
PAPACOSTAS substation is owned by EAC. It is one of the 52 EAC-owned transmission substations, out of 55 in total.
Is a DSO area of influence published for PAPACOSTAS substation?
Yes. A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.
How recent is this data?
Snapshot of 14 Sept 2026. We reproduce what DSD publishes. These are not realtime measurements.

Sources

Electricity Authority of Cyprus, Distribution System Operator · DSD ArcGIS service, RES hosting per transmission substation.

We reproduce what DSD publishes. These are not realtime measurements.

Indicative assessment. It is not planning or investment advice. Confirm with the competent authorities.

Το Δίκτυο shows the state of the grid; it does not promise approvals.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map