YPSONAS

RES hosting capacity 14.22 MW
Available today 0.00 MW Saturated
Substation upgrade 2027 +70 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

8 of the 21 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 8 1.76 1 / 4
All 21 39.454 39.948 / 127.552

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 IOANNOU ALTERNATIVE ENERGY LTD 1 4 498005635
35 BIOLAND PROJECT 62 LTD 0.2 498001862
35 BIOLAND PROJECT 62 LTD 0.2 498001863
35 BIOLAND PROJECT 62 LTD 0.2 498001864
35 BIOLAND PROJECT 62 LTD 0.12 498001865
35 BIOLAND PROJECT 62 LTD 0.12 498001866
35 DEMETRA A. CASH & CARRY LTD 0.8 498002582
35 DRACOUDIS ENERGY LTD 0.12 498003722
The 13 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
GOTIARE LIMITED 7.091 4.5 9 498001787
GOTIARE LIMITED 2.387 1.6 3.2 498001788
GOTIARE LIMITED 4.354 2.75 5.5 498001789
D.P. ELSΙM LTD 3 498001891
FUTURE SUN POWER LTD 1.619 1 1 498001921
IGVA SOLAR ENERGY LTD 7.3 5 10 498002444
ELECTRILO LTD 0.994 1 2 498002596
N&R SOLAR LTD 1.395 498002782
Private individual 0.15 0.03 0.45 498002958
ΔΗΜΟΣ ΠΟΛΕΜΙΔΙΩΝ 5.904 1.968 10.182 498003544
D.P. ELSΙM LTD 3.5 3.6 12 498005300
D.P. ELSΙM LTD 0 8.75 35.11 498005671
D.P. ELSΙM LTD 0 8.75 35.11 498005673

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.