ERGATES

RES hosting capacity 47.50 MW
Available today 0.00 MW Saturated
Substation upgrade 2028 +48.5 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

26 of the 50 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 26 53.06 49.88 / 138.088
All 50 132.177 61.576 / 180.752

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 SVEA SOLAR CYPRUS LTD 3 6.88 498003661
100 GIGAWATT GLOBAL (CYPRUS)LTD 5 10.11 498004400
100 CYPV SUNRISING ENERGY LTD 3 6.1 498004401
100 GIGAWATT GLOBAL (CYPRUS)LTD 5 10.11 498004510
100 VEMARIA ENTERPRISES LIMITED 5 12.5 498004957
100 VEMARIA ENTERPRISES LIMITED 2.5 7.5 498004958
100 IRIS LENOR ENERGY LTD 1.5 4.5 498005027
100 SANTIAM INVESTMENT II LTD 1.9 10 498005037
100 SANTIAM INVESTMENT V LTD 1.92 10 498005038
100 SANTIAM INVESTMENT VI LTD 1.56 10 498005040
100 THREE HATS LTD 1 2.06 498005449
100 WANERON ENTERPRISES LTD 3 11.328 498005692
70 TFC DEVELOPMENTS LTD 5 5 10 400466351/498004614
70 TFC DEVELOPMENTS LTD 4.26 4 8 400466352/498004615
70 DIANARY HOLDINGS LTD 0.6 2.5 10 498005685
65 T.P.M ABITENERGY LTD 1 3 498004444
35 TP MEDITERRANEAN ADVENTURES LTD 1.6 3 6 400466346/498004616
35 VANALIO HOLDINGS LTD 3.9 400466348
35 ΗΛΕΚΤΡΙΚΗ ΛΤΔ (ΑΗΚ) 3.5 400473883
35 ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Ζ 5 400475204
35 ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Ξ 8 400475206
35 ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Ν 8 400475207
35 ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Μ 8 400475208
35 CYSW SOLAR WORLD LTD 4.9 498000320
35 TSIGARIDES ELECTRICAL CONSTRUCTIONS 0.15 498003623
35 TSIGARIDES ELECTRICAL CONSTRUCTIONS 0.15 498003625
The 24 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BIOLAND PROJECT 30 LTD 0.5 400377555
VANALIO HOLDINGS LTD 1.6 400466344
VANALIO HOLDINGS LTD 3.5 400466345
VANALIO HOLDINGS LTD 1.4 400466347
DIANARY HOLDINGS LTD 4.99 400466349
ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Η 5 400475200
ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ E 8 400475205
ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Λ 8 400475209
ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Κ 8 400475211
ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Ι 5 400475212
ΑΗΚ ΙΑΚ ΑΧΕΡΑ ΑΝΑΝΕΩΣΙΜΕΣ ΛΤΔ Θ 5 400475213
BIOLAND PROJECT 26 LTD 1.2 400478208
ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 3.5 498000745
ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 2.6 498000746
ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 4 498000926
BP-S 127 LTD 1.2 498001859
GKA ENERGY LTD 3.14 1.046 5.064 498002164
IRIS LENOR ENERGY LTD 0.35 498002590
TZOPAN INVESTMENTS LTD 1.087 1 2 498002933
Private individual 0.15 498004060
IGVA SOLAR ENERGY LTD 1.5 1 4 498004084
PETROLINA ELECTRIC LTD 4.5 4.5 15 498005348
DLM FAMILIAR SOLAR 0.15 0.6 498005554
CYSW SOLAR WORLD LTD 4.9 4 16 498005689/4998000320

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.