Skip to content

LATSIA

RES hosting capacity 54.04 MW
Available today 0.00 MW Saturated
Substation upgrade 2034 +86 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

17 of the 36 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 17 31.62 21.226 / 53.996
All 36 81.784 43.876 / 115.46

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 BIOLAND PROJECT 53 LTD 0.3 1.2 498005545
100 BIOLAND PROJECT 53 LTD 1.2 4.8 498005546
100 EASY POWER (CYPRUS) LTD 4.696 11.328 498005557
100 EASY POWER (CYPRUS) LTD 5.58 11.328 498005558
100 M.X GREENERGY LTD 2.6 10 498005681
70 ΜΕΤΤΑS BONDED STORES LTD 1 1 3.34 498000774/498005752
70 ROYAL VALLEY HOLDINGS LTD 4.35 4.35 6 498005196
35 ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 8 498000928
35 ESPERIA ENERGY(TSERI 2)LIMITED 2.75 498001021
35 ESPERIA ENERGY(TSERI 3)LIMITED 4.75 498001024
35 Α & Κ ΒΑΣΙΛΕΙΟΥ ΑΚΙΝΗΤΑ ΛΤΔ 0.52 498002499
35 S/PETSAS ENERGY LTD 0.151 498003744
35 CYPAX INVESTMENTS LTD 0.1 498004058
35 CYPAX INVESTMENTS LTD 0.16 498004059
35 ROYAL VALLEY HOLDINGS LTD 9.72 498005195
35 AGM SUNFIELD LTD 1.5 6 498005664
35 Private individual 0.119 498005682
The 19 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BIOLAND PROJECT 82 LTD 1.9 400478444
BIOLAND PROJECT 80 LTD 1.5 498000165
ALCO PRODUCTS LTD 0.644 498000204
GKA ENERGY LTD 1.305 2.1 0.264 498000263
BIOLAND PROJECT 90 LTD 0.85 498000741
ESPERIA ENERGY(TSERI) LIMITED 7.2 498001158
ESPERIA ENERGY(TSERI 2)LIMITED 7.99 498001517
AGM SOLAR POWER LTD 5 498001934
HELIOPEX 3 LIMITED 6.37 2.8 7.9 498002085
HELIOPEX 1 LIMITED 6.23 3.85 7.7 498002087
PANASKA TRADING CO LTD 0.3 498002275
SSH IDALIUM SOLAR ENERGY 5 498002500
BP-S 151 LTD 2.7 2.7 5.4 498002839
BP-S 151 LTD 0.5 0.5 1 498002842
BP-S 127 LTD 1.8 1.8 3.6 498002843
SMARTLY & CO SOLAR PARKS LTD 0.875 0.8 3.2 498005422
Υ.Α. WINDENERGY LTD 0.6 2.4 498005552
ESPERIA ENERGY(TSERI 3)LIMITED 4.75 20 498005755
ESPERIA ENERGY(TSERI 2)LIMITED 2.75 10 498005758

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map