KARVOUNAS
RES hosting capacity 17.44 MW
Available today 14.82 MW
Substation upgrade 2030 +1 MW (N-1) ΔΠΑΣΜ draft, under consultation
DSO priority list
Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026
| Applications | RES MW | Batteries MW / MWh | |
|---|---|---|---|
| In line | 0 | 0 | 0 / 0 |
| All | 0 | 0 | 0 / 0 |
The DSO lists no applications for this substation in this list.
The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».
DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026