TRANSMISSION SUBSTATION
PSEVDAS
PSEVDAS transmission substation (DSMK): 0.00 MW of available RES capacity out of 0.00 MW hosting capacity. As published by DSD, snapshot of 14 Sept 2026.
Psevdas, Alexigros and Orites belong to DSMK and are shown as a separate class, not alongside EAC’s 52 substations.
Capacity
Saturated. This substation publishes zero available capacity.
Capacity history
From our own daily snapshots of the source.
View the data as a table
| Date | Available capacity | Utilization |
|---|---|---|
| 17 Jul 2026 | 0.00 MW | — |
| 18 Jul 2026 | 0.00 MW | — |
| 19 Jul 2026 | 0.00 MW | — |
| 20 Jul 2026 | 0.00 MW | — |
| 21 Jul 2026 | 0.00 MW | — |
| 22 Jul 2026 | 0.00 MW | — |
| 23 Jul 2026 | 0.00 MW | — |
| 24 Jul 2026 | 0.00 MW | — |
| 25 Jul 2026 | 0.00 MW | — |
| 26 Jul 2026 | 0.00 MW | — |
| 27 Jul 2026 | 0.00 MW | — |
| 28 Jul 2026 | 0.00 MW | — |
| 29 Jul 2026 | 0.00 MW | — |
| 30 Jul 2026 | 0.00 MW | — |
| 31 Jul 2026 | 0.00 MW | — |
| 1 Aug 2026 | 0.00 MW | — |
| 2 Aug 2026 | 0.00 MW | — |
| 3 Aug 2026 | 0.00 MW | — |
| 4 Aug 2026 | 0.00 MW | — |
| 5 Aug 2026 | 0.00 MW | — |
| 6 Aug 2026 | 0.00 MW | — |
| 7 Aug 2026 | 0.00 MW | — |
| 8 Aug 2026 | 0.00 MW | — |
| 9 Aug 2026 | 0.00 MW | — |
| 10 Aug 2026 | 0.00 MW | — |
| 11 Aug 2026 | 0.00 MW | — |
| 12 Aug 2026 | 0.00 MW | — |
| 13 Aug 2026 | 0.00 MW | — |
| 14 Aug 2026 | 0.00 MW | — |
| 15 Aug 2026 | 0.00 MW | — |
| 16 Aug 2026 | 0.00 MW | — |
| 17 Aug 2026 | 0.00 MW | — |
| 18 Aug 2026 | 0.00 MW | — |
| 19 Aug 2026 | 0.00 MW | — |
| 20 Aug 2026 | 0.00 MW | — |
| 21 Aug 2026 | 0.00 MW | — |
| 22 Aug 2026 | 0.00 MW | — |
| 23 Aug 2026 | 0.00 MW | — |
| 24 Aug 2026 | 0.00 MW | — |
| 25 Aug 2026 | 0.00 MW | — |
| 26 Aug 2026 | 0.00 MW | — |
| 27 Aug 2026 | 0.00 MW | — |
| 28 Aug 2026 | 0.00 MW | — |
| 29 Aug 2026 | 0.00 MW | — |
| 30 Aug 2026 | 0.00 MW | — |
| 31 Aug 2026 | 0.00 MW | — |
| 1 Sept 2026 | 0.00 MW | — |
| 2 Sept 2026 | 0.00 MW | — |
| 3 Sept 2026 | 0.00 MW | — |
| 4 Sept 2026 | 0.00 MW | — |
| 5 Sept 2026 | 0.00 MW | — |
| 6 Sept 2026 | 0.00 MW | — |
| 7 Sept 2026 | 0.00 MW | — |
| 8 Sept 2026 | 0.00 MW | — |
| 9 Sept 2026 | 0.00 MW | — |
| 10 Sept 2026 | 0.00 MW | — |
| 11 Sept 2026 | 0.00 MW | — |
| 12 Sept 2026 | 0.00 MW | — |
| 13 Sept 2026 | 0.00 MW | — |
| 14 Sept 2026 | 0.00 MW | — |
DSO area of influence
No DSO area of influence published
No DSO polygon is published for this substation. The source contains 52 areas of influence.
Not yet integrated
The following exist in published sources but are not yet integrated into Το Δίκτυο. While they are missing, we do not put an estimate in their place.
-
PV applications conditional on an upgrade
PENDINGAppendix ΣΤ is a DSO document covering distribution-network substations. It does not cover the DSMK-owned substations.
-
Upgrade request
PENDINGDSD requests as recorded in DPASM 2026-2035.
-
Loading projections
PENDINGDPASM 2026-2035, Appendix 4.
-
Projects inside the DSO area of influence
PENDINGAnonymized project dots inside the DSO-published area of influence.
Frequently asked questions
- How much RES capacity is available at PSEVDAS substation?
- None. PSEVDAS substation publishes 0.00 MW of available RES capacity, which means it is saturated against 0.00 MW of hosting capacity.
- Is PSEVDAS substation saturated?
- Yes. PSEVDAS substation publishes zero available RES capacity. New capacity depends on a network upgrade.
- Who owns PSEVDAS substation?
- PSEVDAS substation is owned by DSMK. Psevdas, Alexigros and Orites belong to DSMK and are shown as a separate class, not alongside EAC’s 52 substations.
- Is a DSO area of influence published for PSEVDAS substation?
- No. No DSO polygon is published for this substation. The source contains 52 areas of influence.
- How recent is this data?
- Snapshot of 14 Sept 2026. We reproduce what DSD publishes. These are not realtime measurements.