TRANSMISSION SUBSTATION

PSEVDAS

PSEVDAS transmission substation (DSMK): 0.00 MW of available RES capacity out of 0.00 MW hosting capacity. As published by DSD, snapshot of 14 Sept 2026.

DSMK-owned T03SS087 As published by DSD · snapshot 14/09/2026, 04:20

Psevdas, Alexigros and Orites belong to DSMK and are shown as a separate class, not alongside EAC’s 52 substations.

Capacity

Utilization
RES hosting capacity0.00 MW
Installed RES42.93 MW
Available capacity0.00 MW
Utilization
Nominal rating40 MVA
Firm capacity0 MVA
OwnershipDSMK-owned
Coordinates34.9583°N · 33.4961°E

Saturated. This substation publishes zero available capacity.

Capacity history

From our own daily snapshots of the source.

Available capacity (MW)Utilization (%)
View the data as a table
Capacity history
DateAvailable capacityUtilization
17 Jul 20260.00 MW
18 Jul 20260.00 MW
19 Jul 20260.00 MW
20 Jul 20260.00 MW
21 Jul 20260.00 MW
22 Jul 20260.00 MW
23 Jul 20260.00 MW
24 Jul 20260.00 MW
25 Jul 20260.00 MW
26 Jul 20260.00 MW
27 Jul 20260.00 MW
28 Jul 20260.00 MW
29 Jul 20260.00 MW
30 Jul 20260.00 MW
31 Jul 20260.00 MW
1 Aug 20260.00 MW
2 Aug 20260.00 MW
3 Aug 20260.00 MW
4 Aug 20260.00 MW
5 Aug 20260.00 MW
6 Aug 20260.00 MW
7 Aug 20260.00 MW
8 Aug 20260.00 MW
9 Aug 20260.00 MW
10 Aug 20260.00 MW
11 Aug 20260.00 MW
12 Aug 20260.00 MW
13 Aug 20260.00 MW
14 Aug 20260.00 MW
15 Aug 20260.00 MW
16 Aug 20260.00 MW
17 Aug 20260.00 MW
18 Aug 20260.00 MW
19 Aug 20260.00 MW
20 Aug 20260.00 MW
21 Aug 20260.00 MW
22 Aug 20260.00 MW
23 Aug 20260.00 MW
24 Aug 20260.00 MW
25 Aug 20260.00 MW
26 Aug 20260.00 MW
27 Aug 20260.00 MW
28 Aug 20260.00 MW
29 Aug 20260.00 MW
30 Aug 20260.00 MW
31 Aug 20260.00 MW
1 Sept 20260.00 MW
2 Sept 20260.00 MW
3 Sept 20260.00 MW
4 Sept 20260.00 MW
5 Sept 20260.00 MW
6 Sept 20260.00 MW
7 Sept 20260.00 MW
8 Sept 20260.00 MW
9 Sept 20260.00 MW
10 Sept 20260.00 MW
11 Sept 20260.00 MW
12 Sept 20260.00 MW
13 Sept 20260.00 MW
14 Sept 20260.00 MW

DSO area of influence

No DSO area of influence published

No DSO polygon is published for this substation. The source contains 52 areas of influence.

Not yet integrated

The following exist in published sources but are not yet integrated into Το Δίκτυο. While they are missing, we do not put an estimate in their place.

  • PV applications conditional on an upgrade

    PENDING

    Appendix ΣΤ is a DSO document covering distribution-network substations. It does not cover the DSMK-owned substations.

  • Upgrade request

    PENDING

    DSD requests as recorded in DPASM 2026-2035.

  • Loading projections

    PENDING

    DPASM 2026-2035, Appendix 4.

  • Projects inside the DSO area of influence

    PENDING

    Anonymized project dots inside the DSO-published area of influence.

Frequently asked questions

How much RES capacity is available at PSEVDAS substation?
None. PSEVDAS substation publishes 0.00 MW of available RES capacity, which means it is saturated against 0.00 MW of hosting capacity.
Is PSEVDAS substation saturated?
Yes. PSEVDAS substation publishes zero available RES capacity. New capacity depends on a network upgrade.
Who owns PSEVDAS substation?
PSEVDAS substation is owned by DSMK. Psevdas, Alexigros and Orites belong to DSMK and are shown as a separate class, not alongside EAC’s 52 substations.
Is a DSO area of influence published for PSEVDAS substation?
No. No DSO polygon is published for this substation. The source contains 52 areas of influence.
How recent is this data?
Snapshot of 14 Sept 2026. We reproduce what DSD publishes. These are not realtime measurements.

Sources

Electricity Authority of Cyprus, Distribution System Operator · DSD ArcGIS service, RES hosting per transmission substation.

We reproduce what DSD publishes. These are not realtime measurements.

Indicative assessment. It is not planning or investment advice. Confirm with the competent authorities.

Το Δίκτυο shows the state of the grid; it does not promise approvals.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map