Skip to content

TRANSMISSION SUBSTATION

DHASOUPOLIS

DHASOUPOLIS transmission substation (EAC): 67.77 MW of available RES capacity out of 90.39 MW hosting capacity, 25.0% utilized. As published by DSD, snapshot of 14 Sept 2026.

EAC-owned T02SS044 As published by DSD · snapshot 14/09/2026, 04:20

Capacity

Utilization
RES hosting capacity90.39 MW
Installed RES22.62 MW
Available capacity67.77 MW
Utilization25.0%
Nominal rating120 MVA
Firm capacity80 MVA
OwnershipEAC-owned
Coordinates35.1388°N · 33.3739°E

Capacity history

From our own daily snapshots of the source.

Available capacity (MW)Utilization (%)
View the data as a table
Capacity history
DateAvailable capacityUtilization
17 Jul 202667.77 MW25.0%
18 Jul 202667.77 MW25.0%
19 Jul 202667.77 MW25.0%
20 Jul 202667.77 MW25.0%
21 Jul 202667.77 MW25.0%
22 Jul 202667.77 MW25.0%
23 Jul 202667.77 MW25.0%
24 Jul 202667.77 MW25.0%
25 Jul 202667.77 MW25.0%
26 Jul 202667.77 MW25.0%
27 Jul 202667.77 MW25.0%
28 Jul 202667.77 MW25.0%
29 Jul 202667.77 MW25.0%
30 Jul 202667.77 MW25.0%
31 Jul 202667.77 MW25.0%
1 Aug 202667.77 MW25.0%
2 Aug 202667.77 MW25.0%
3 Aug 202667.77 MW25.0%
4 Aug 202667.77 MW25.0%
5 Aug 202667.77 MW25.0%
6 Aug 202667.77 MW25.0%
7 Aug 202667.77 MW25.0%
8 Aug 202667.77 MW25.0%
9 Aug 202667.77 MW25.0%
10 Aug 202667.77 MW25.0%
11 Aug 202667.77 MW25.0%
12 Aug 202667.77 MW25.0%
13 Aug 202667.77 MW25.0%
14 Aug 202667.77 MW25.0%
15 Aug 202667.77 MW25.0%
16 Aug 202667.77 MW25.0%
17 Aug 202667.77 MW25.0%
18 Aug 202667.77 MW25.0%
19 Aug 202667.77 MW25.0%
20 Aug 202667.77 MW25.0%
21 Aug 202667.77 MW25.0%
22 Aug 202667.77 MW25.0%
23 Aug 202667.77 MW25.0%
24 Aug 202667.77 MW25.0%
25 Aug 202667.77 MW25.0%
26 Aug 202667.77 MW25.0%
27 Aug 202667.77 MW25.0%
28 Aug 202667.77 MW25.0%
29 Aug 202667.77 MW25.0%
30 Aug 202667.77 MW25.0%
31 Aug 202667.77 MW25.0%
1 Sept 202667.77 MW25.0%
2 Sept 202667.77 MW25.0%
3 Sept 202667.77 MW25.0%
4 Sept 202667.77 MW25.0%
5 Sept 202667.77 MW25.0%
6 Sept 202667.77 MW25.0%
7 Sept 202667.77 MW25.0%
8 Sept 202667.77 MW25.0%
9 Sept 202667.77 MW25.0%
10 Sept 202667.77 MW25.0%
11 Sept 202667.77 MW25.0%
12 Sept 202667.77 MW25.0%
13 Sept 202667.77 MW25.0%
14 Sept 202667.77 MW25.0%

DSO area of influence

The DSO publishes an area of influence for this substation; it is not a connection guarantee.

A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.

PV applications conditional on an upgrade

Applications for a ΠΟΣ connection offer for PV outside the Support Scheme, under examination conditional on upgrading the transmission substation. This is not the total pending pipeline.

This substation is not listed in Appendix ΣΤ. That means no applications are recorded as depending on upgrading it, not that there are no pending applications.

DPASD 2025-2034, Appendix ΣΤ

Not yet integrated

The following exist in published sources but are not yet integrated into Το Δίκτυο. While they are missing, we do not put an estimate in their place.

  • Upgrade request

    PENDING

    DSD requests as recorded in DPASM 2026-2035.

  • Loading projections

    PENDING

    DPASM 2026-2035, Appendix 4.

  • Projects inside the DSO area of influence

    PENDING

    Anonymized project dots inside the DSO-published area of influence.

Frequently asked questions

How much RES capacity is available at DHASOUPOLIS substation?
DHASOUPOLIS substation has 67.77 MW of available RES capacity out of 90.39 MW of hosting capacity, that is 25.0% utilization.
Is DHASOUPOLIS substation saturated?
No. 67.77 MW of available RES capacity remain and utilization is 25.0%, as published by DSD.
Who owns DHASOUPOLIS substation?
DHASOUPOLIS substation is owned by EAC. It is one of the 52 EAC-owned transmission substations, out of 55 in total.
Is a DSO area of influence published for DHASOUPOLIS substation?
Yes. A DSO-published polygon for the area-associated substation. It does not guarantee a connection point or connection capability.
How recent is this data?
Snapshot of 14 Sept 2026. We reproduce what DSD publishes. These are not realtime measurements.

Sources

Electricity Authority of Cyprus, Distribution System Operator · DSD ArcGIS service, RES hosting per transmission substation.

We reproduce what DSD publishes. These are not realtime measurements.

Indicative assessment. It is not planning or investment advice. Confirm with the competent authorities.

Το Δίκτυο shows the state of the grid; it does not promise approvals.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map