Skip to content

SOTIRA

RES hosting capacity 46.64 MW
Available today 3.78 MW
Substation upgrade No year published

DSO priority list

None of the 3 applications meets the maturity criteria yet, so none is in the line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 0 0 0 / 0
All 3 3.089 6.4 / 27.57
The 3 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
GKA SUNPOWER LTD 1.989 0.3 3.17 498000214
BP-S 115 LTD 1.1 1.1 4.4 498003593
BATT.MAN LTD 5 20 498003651

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map