FREE INDUSTRIAL ZONE

RES hosting capacity 48.52 MW
Available today 0.00 MW Saturated
Substation upgrade 2027 +86 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

9 of the 35 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 9 5.97 4.198 / 14.792
All 35 41.95 31.917 / 110.091

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
100 BIOLAND PROJECT 55 LTD 0.999 3.996 498004759
100 BIOLAND PROJECT 55 LTD 0.999 3.996 498004761
100 P. EVANGELOU SOLAR TRADING LTD 0.2 0.8 498005701
100 P. EVANGELOU SOLAR TRADING LTD 1 4 498005702
35 ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 3.2 1 2 498001616
35 LOGISTICO PARK LTD 1.235 498002100
35 PETROLINA HOLDINGS PUBLIC LTD 1.19 498003060
35 ASG (Andy Spryrou Group) LTD 0.225 498003298
35 E.P.X. WAREHOUSES LTD 0.12 498003336
The 26 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
GEISEL LTD 2 1 400412389
BIOLAND PROJECT 83 LTD 1 498000071
BIOLAND PROJECT 89 LTD 2 498000339
BIOLAND PROJECT 96 LTD 1 498000340
BIOLAND PROJECT 90 LTD 0.35 498000456
BIOLAND PROJECT 90 LTD 0.35 498000457
BIOLAND PROJECT 91 LTD 5 498000627
BIOLAND PROJECT 82 LTD 1 498000632
BIOLAND PROJECT 82 LTD 0.5 498000633
BP96-2 LTD 2.4 498001043
F.G.CY CHOCOLIFE LTD 0.15 498001857
BIOLAND PROJECT 46 LTD 4.5 4.5 4.5 498001873
P.P. ENERGIA LTD 0.268 498002668
P.P. ENERGIA LTD 0.498 498002728
Private individual 0.12 0.119 0.399 498003467
BP-S 154 LTD 1.2 1.2 4.8 498003756
BP-S 153-1 LTD 1.5 1.5 6 498004268
BP-S 153-2 LTD 1.5 1.5 6 498004270
BP-S 153-3 LTD 1.5 1.5 6 498004271
LEALOUS LTD 2.764 498005162
PETROLINA ELECTRIC LTD 12 50 498005183
FIVE RED LTD 1.98 498005241
BP-S-154 LTD 1.2 1.2 4.8 498005363
ABOVENERGY LTD 2 2 4 498005712
BP -S 154 LTD 1.2 1.2 4.8 498005788
BP -S 154 LTD 1 1 4 498005789

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.