ANATOLIKO 66KV

RES hosting capacity 20.86 MW
Available today 0.00 MW Saturated
Substation upgrade 2028 +64 MW (N-1) ΔΠΑΣΜ draft, under consultation

DSO priority list

4 of the 10 applications meet the maturity criteria and are in the priority line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 4 1.8 26.8 / 108.4
All 10 3.1 38.25 / 154.08

In the priority line

Score up to 100: the higher, the further ahead.
Score Applicant RES MW Battery MW Battery MWh Application
70 A.N. IOANNOU ENERGY LTD 0.2 0.2 1.2 498005784
70 Α.Ν. IOANNOU ENERGY LTD 0.4 0.4 2.4 498005785
70 PYRASOL INVESTMENTS LTD 1.2 1.2 4.8 498005786
35 HELLENIQ RENEWABLES CYPRUS PAPHOS LTD 25 100 ΔΣΜΚ(320.7.26)(498004467)
The 6 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
SPANERCOM LTD 5 20 498005022
SPANERCOM LTD 5 20 498005023
Private individual 0.15 0.15 0.6 498005137
Private individual 0.15 0.15 0.6 498005234
TOTALCON LTD 1 1 4 498005656
A.CH.DMD FUTURE ENERGY LTD 0.15 0.48 498005781

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.