ANATOLIKO 66KV
RES hosting capacity 20.86 MW
Available today 0.00 MW Saturated
Substation upgrade 2028 +64 MW (N-1) ΔΠΑΣΜ draft, under consultation
DSO priority list
4 of the 10 applications meet the maturity criteria and are in the priority line.
Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026
| Applications | RES MW | Batteries MW / MWh | |
|---|---|---|---|
| In line | 4 | 1.8 | 26.8 / 108.4 |
| All | 10 | 3.1 | 38.25 / 154.08 |
In the priority line
| Score | Applicant | RES MW | Battery MW | Battery MWh | Application |
|---|---|---|---|---|---|
| 70 | A.N. IOANNOU ENERGY LTD | 0.2 | 0.2 | 1.2 | 498005784 |
| 70 | Α.Ν. IOANNOU ENERGY LTD | 0.4 | 0.4 | 2.4 | 498005785 |
| 70 | PYRASOL INVESTMENTS LTD | 1.2 | 1.2 | 4.8 | 498005786 |
| 35 | HELLENIQ RENEWABLES CYPRUS PAPHOS LTD | 25 | 100 | ΔΣΜΚ(320.7.26)(498004467) |
The 6 applications outside the line
| Applicant | RES MW | Battery MW | Battery MWh | Application |
|---|---|---|---|---|
| SPANERCOM LTD | 5 | 20 | 498005022 | |
| SPANERCOM LTD | 5 | 20 | 498005023 | |
| Private individual | 0.15 | 0.15 | 0.6 | 498005137 |
| Private individual | 0.15 | 0.15 | 0.6 | 498005234 |
| TOTALCON LTD | 1 | 1 | 4 | 498005656 |
| A.CH.DMD FUTURE ENERGY LTD | 0.15 | 0.48 | 498005781 |
The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».
DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026