NEW-TRIMIKLINI

RES hosting capacity 20.64 MW
Available today 0.00 MW Saturated
Substation upgrade 2030 ΔΠΑΣΜ draft, under consultation

DSO priority list

None of the 4 applications meets the maturity criteria yet, so none is in the line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 0 0 0 / 0
All 4 5.04 6.7 / 15
The 4 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
SONTSE PV ALPHA LTD 4.48 498000915
KEO PLC 0.56 498002659
VLASIOU ELECTRIC SISTERS & 2.2 5 498005745
SUNA LTD 4.5 10 498005746

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.