Skip to content

PYLA-GIS 132kV

RES hosting capacity 43.35 MW
Available today 0.00 MW Saturated
Substation upgrade No year published

DSO priority list

None of the 20 applications meets the maturity criteria yet, so none is in the line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 0 0 0 / 0
All 20 126.274 9.4 / 25.21
The 20 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
ΕΤΑΙΡΕΙΑ ΣΚΥΡΩΝ ΚΑΙ ΜΕΤΑΦΟΡΩΝ Χ'ΧΡΙΣΤΟΦΗ ΚΑΙ ΝΙΚΟΛΗ ΑΘΗΕΝΟΥ ΛΤΔ 1.5 400385684
GREENEIN ENERGIES KYRA LTD 7.999 498001693
GREENEIN ENERGIES KYRA LTD 3.498 498001694
GREENEIN ENERGIES KYRA LTD 3.999 498001696
GREENEIN ENERGIES KYRA LTD 7.999 498001697
GREENEIN ENERGIES KYRA LTD 7.999 498001698
GREENEIN ENERGIES KYRA LTD 7.999 498001699
GREENEIN ENERGIES KYRA LTD 7.999 498001700
GREENEIN ENERGIES KYRA LTD 7.999 498001701
GREENEIN ENERGIES KYRA LTD 7.999 498001702
GREENEIN ENERGIES KYRA LTD 7.999 498001703
GREENEIN ENERGIES KYRA LTD 3.999 498001704
GREENEIN ENERGIES KYRA LTD 7.999 498001705
GREENEIN ENERGIES KYRA LTD 7.999 498001706
GREENEIN ENERGIES KYRA LTD 7.999 498001707
GREENEIN ENERGIES KYRA LTD 7.999 498001708
GREENEIN ENERGIES KYRA LTD 7.999 498001709
GKA ENERGY LTD 6.511 6.4 13.21 498003770
LECCINO SOLAR LTD 0.28 0.5 2 498004740
A.V.EARTH REGENERATION LTD 2.5 2.5 10 498005678

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.

Want a professional check on a parcel served by this substation?

Parcel check →
Back to the map