DHEKELIA GIS 132kV

RES hosting capacity 47.46 MW
Available today 8.36 MW
Substation upgrade No year published

DSO priority list

None of the 41 applications meets the maturity criteria yet, so none is in the line.

Preliminary list 15/10/2026 · objections until 25/10/2026 · final ranking 1/11/2026

Applications RES MW Batteries MW / MWh
In line 0 0 0 / 0
All 41 121.074 72.488 / 143.64
The 41 applications outside the line
Applicant RES MW Battery MW Battery MWh Application
BP-S 107 LTD 0.9 498001241
BP-S 108 LTD 1.2 498001262
SHERBETIFY LTD 0.8 0.8 0.8 498001752
SHERBETIFY LTD 1.3 1.3 1.3 498001753
BP-S 114 LTD 4.5 0.5 0.5 498001754
BP-S 114 LTD 2.5 2.5 2.5 498001755
BP-S 107 LTD 1.15 498001756
BP-S 108 LTD 1.5 1.5 1.5 498002023
SOLAR NOVA LTD 4 2 4 498002650
BP-S 140 LTD 4 4 8 498002776
BP-S 137 LTD 4 4 8 498002783
SUN PADIVAN GROUP LTD 1.175 1 2 498002831-498005592
SUN PADIVAN GROUP LTD 3.169 3 6.5 498002911-498005588
SUN PADIVAN GROUP LTD 2.167 2.167 2 498003231-498005590
SUN PADIVAN GROUP LTD 3.496 3 6.5 498003232-498005591
SUN PADIVAN GROUP LTD 6.6 6 13.5 498003233-498005589
CCK ALTENERGO ENTE. - PROJECT 1 LTD 0.5 0.6 0.6 498003416
CCK ALTENERGO ENTE. - PROJECT 1 LTD 4 1.5 1.5 498003417
PHOENIX POWER 5 LTD 3.7 498003466
BP-S 137 LTD 0.7 0.7 2.8 498003562
PHOENIX POWER 4 LTD 7 498004112
PHOENIX POWER 4 LTD 7.9 498004113
PHOENIX POWER 4 LTD 7.5 498004114
IGVA SOLAR ENERGY LTD 7.995 7.995 6 498004154
IGVA SOLAR ENERGY LTD 6.05 6.05 5 498004639
BP-S 100 LTD 1.5 1.5 6 498004641
BP-S 100 LTD 0.8 0.8 3.2 498004642
PVP ECOSAVER ENERGY LTD 1.4 498004693
PVP ECOSAVER ENERGY LTD 1.7 1.7 5 498004694
PVP ECOSAVER ENERGY LTD 1.5 1.5 3 498004695
PVP ECOSAVER ENERGY LTD 0.99 0.99 2 498004696
PVP ECOSPARKS ENERGY LTD 1.4 1.4 3 498004697
PVP ECOSPARKS ENERGY LTD 1.5 1.5 3 498004698
PVP ECOSPARKS ENERGY LTD 0.99 0.99 2 498004699
BP-S 114 LTD 1.5 1.5 4.5 498004766
BP-S 140 LTD 1.5 1.5 4.5 498004767
BP-S 114 LTD 1 1 3 498004771
ESPERIA ENERGY LTD 5.746 5.746 17.24 498005367
ESPERIA ENERGY LTD 7.996 498005369
PETROLINA ELECTRIC LTD 1.45 1.45 5 498005476
ΑΡΧΗ ΗΛΕΚΤΡΙΣΜΟΥ ΚΥΠΡΟΥ 2.3 2.3 9.2 498005626

The line does not bind the DSO to issue connection terms. It leaves out projects already holding terms or connected. Private individuals show as «Private individual».

DSO (EAC), Information Bulletin No. 05/2026 · 15/10/2026

Sources: DSD, data of 2 Nov 2026 · DSMK, ΔΠΑΣΜ 2026-2035. The upgrade’s «+MW (N-1)» is our calculation of firm capacity, not a RES hosting capacity. It is not a connection approval or investment advice.